PROJECTS

LOWER KALEKÖY
DAM AND HEPP

Lower Kaleköy Dam and HEPP Project is located 2 km downstream of the confluence of Yiğitler (Vahkin) Stream and Murat River. It is located 15 km northeast of Genç District in Bingöl Province. The installed capacity of the facility to be constructed on the Murat River is 500.00 MWe, and it is planned that the facility will generate 1,193.17 GWh
energy annually.

The composite body of the Lower Kaleköy Dam is
planned as an asphalt core embankment at the left
bank and RCC at the right bank. With this design feature, the Lower Kalekoy Project will be the first Asphalt Core Dam in Turkey, and it has 3,250,000 m³ fill volume and
2,100,000 m
³ RCC volume. The width of the 940.00 m-long crest is 10.00 m and its height from the thalweg and the foundation are 95.00 m and 117.00 m respectively.

The powerhouse, which is designed independently from the dam body, is composed of 3 main and 1 small units
(3 x 155.49 MWe + 33.53 MWe) located on the right bank. 

The 4 radial gated spillway structure will be constructed on the right bank over the RCC dam body, and its discharge capacity is 9,247 m³/s.

Moreover, with its 500.00 MWe installed capacity, Lower Kaleköy Dam and HEPP will be the 5ᵗʰ Largest HEPP by Installed Capacity in Turkey developed by the private sector

CompanyKalehan Genç Enerji Üretim A.Ş.
License NoEÜ/5017-2/03126 – 21.05.2014
Installed Capacity510.20 MWm / 500.00 MWe
Total Energy1,193.17 GWh
Design Discharge628.73 m³/s
Gross Head88.49 m
Net Head87.55 m
Crest Elevation1,107.00 m
Flood Water Level1,103.00 m
Operation Level1,100.00 m
Minimum Water Level1,085.00 m
Thalweg Elevation1,012.00 m
Tailwater Elevation1,011.51 m